Building permit within the meaning of Article 1 of Law. 4030/2011 (A 249), required to perform any building work, such as:
- Construction Demolition. If demolished the entire building and not part of it, is not required to submit building diagram.
- Excavations and embankments greater than plus / minus 0.80 meters, coatings, land formations and land.
- Construction, addition, repair of buildings and their annexes.
- Change of use, if there is a change for the worse in the building diagram elements or design loads of structural design or change of mechanical installations in their journeys from other floors or public areas.
- Construction and adding any form of installation, not specified in paragraphs 2 and 3.
- surrounding wall and fences that are not defined in paragraph 3g.
- Construction of underground tanks